Wotso – Zetland
The Problem
When the cooling tower was not finished and clients were moving in the workspaces at Zetland.
The Challenge
Deliver a temporal cooling system using cooling fans to meet a comfortable temperature in the installations for the customer and staff of our client.
The Solution
We supplied 2 units of 750mm Drum Fan and 4 units of 400mm Pedestal Fan (Tripod).
We are the company to hire cooling and ventilation systems near you.