Industries Construction
Construction
AirXpress Hire construction site services provide the quality temporary cooling, heating or dehumidification equipment and dependable solution you need to keep your project on track, on time, and on budget.
To heating equipment or subsystems, to dehumidify work areas so paint cures and concrete dries faster, or to air conditioning for comfort and productivity, we have solutions you can trust, project after project.
Filter search
Clear search
Categories
- Cooling
- Portable Air Conditioners
- 416 L/s
- 450 mm
- 5 kW
- 50 L
- 5000 L/s
- 6 kW
- 600 mm
- 850 W
- Cooling Fans
- 400 mm
- 450 mm
- 5 kW
- 50 L
- 5000 L/s
- 6 kW
- 600 mm
- 750 mm
- 850 W
- Evaporative Coolers
- 5 kW
- 500 L/s
- 5000 L/s
- Misting Fans
- 5000 L/s
- Ventilation
- Extraction Fans
- 416 L/s
- 6 kW
- Carpet Blowers
- 5 kW
- 50 L
- 600 mm
- 850 W
- Humidity Control
- Portable Dehumidifiers
- 5 kW
- 50 L
- 600 mm
- 850 W
- Air Cleaner Filtration Purifiers
- Air Steriliser Purifiers – Commercial
- 100 sqm
- 175 sqm
- Air Steriliser Purifiers – Medical
- 1000 mg/hr
- 175 sqm
- Odour Mould Control Removal
- 1000 mg/hr
- 175 sqm
- Heating
- Indoor Heaters
- 2000 W
- 2400 W
- Electric
- Outdoor/Patio Heaters
- 2000 W
- 25 sqm
- Electric
- Gas
- Refrigeration
- 6 kW
- Testing Equipment
- Fire Testing Equipment
- 1500 W
- Electric
- Air Leakage Testing Equipment
- 1 KW
- 1 m
- 10 kW
- 10 L
- 10 m
- 100 L
- 100 sqm
- 1000 L/s
- 1000 mg/hr
- 1000 mm
- 10000 mg/hr
- 10amp
- 10m³
- 118 to 236 L/s
- 1250 L/s
- 140 kW
- 1450 W
- 14m³
- 15 kW
- 15 m
- 15 W
- 150 L
- 1500 W
- 15amp
- 16 ft
- 1600 W
- 17000 L/s
- 175 sqm
- 18 ft
- 1800 W
- 180cm x 130cm
- 193 kW
- 1m3/h
- 2 m
- 2.5 m
- 20 ft
- 20 L
- 20 m
- 20 sqm
- 200 mm
- 2000 mg/hr
- 2000 W
- 200cm x 108cm
- 20amp
- 2100 L/s
- 2200 L/s
- 2200 W
- 2250 L/s
- 236 L/s
- 2400 W
- 240cm x 210cm
- 25 sqm
- 250cm x 110cm
- 250cm x 80cm
- 2600 L/s
- 27 sqm
- 278 L/s
- 280 W
- 3 m
- 3.5 KW
- 30 kW
- 30 L
- 30 m
- 30 W
- 300 mm
- 3000 W
- 300cm x 108cm
- 320 W
- 32amp
- 35 L
- 35 sqm
- 350 W
- 360 W
- 3900 L/s
- 3m³
- 4 m
- 4.4 kW
- 4.5 kW
- 4.7 kW
- 40 ft
- 40 L
- 400 mm
- 416 L/s
- 450 mm
- 450 sqm
- 450m3/h
- 470 L/s
- 4m³
- 5
- 5 kW
- 5 m
- 50 L
- 50 W
- 500 L/s
- 500 mm
- 5000 L/s
- 5000 mg/hr
- 50amp
- 5250 L/s
- 55 sqm
- 556 L/s
- 56 kW
- 6
- 6 kW
- 6 m
- 6 X 15 Amp
- 6.5 kW
- 60 L
- 60 sqm
- 600 mm
- 600 sqm
- 600 W
- 6500 L/s
- 6m³
- 7 kVa
- 7 kW
- 7.5 kW
- 70 sqm
- 71 kW
- 75 L
- 75 sqm
- 750 L/s
- 750 mm
- 8 L
- 8 m
- 800 mm
- 85 L
- 850 W
- 8820 L/s
- 8m³
- 9 kW
- 9.5 kW
- 900 mm
- 95 W
- 96 kW
- 99 sqm
- 9m
- air pollutants
- Air Pollution
- air purifier
- Battery Operated
- Daisy chain
- Dry Floor
- Dry Ice
- Electric
- Gas
- Humidifier
- marquee
- Mould
- oxygen booster
- Pollution
- Positive & Negative Pressure
- Using Area
- Virus
- VOC's
- Wet Floor
- Floor Slip Testing Equipment
- Dry Floor
- Wet Floor
Related projects
Testing How Quickly Smoke Is Removed – IPC NSW
IPC NSW is a government company which required to test how quickly smoke is removed from their tenancy during a fire test using a smoke machine.
Testing Fire Stair Pressurisation System – 201 Elizabeth St
Our client required to test the Fire Stair Pressurisation System at 201 Elizabeth street using a smoke machine.
Telstra Exchange North Sydney
Telstra Exchange North Sydney needed to be cooled during an air conditioning shut down to avoid malfunctions from exposure to high temperatures.
Symbion Healthcare – Greystanes
The air conditioning of the Symbion Healthcare Server room shutdown over the weekend.
Wagga Wagga – Aircon Duct Leakage Test
A duct leakage testing of air handling heat exchange units was required for an American Satellite company in Wagga Wagga.
Wagga Wagga – Smoke Leakage Testing
An American Satellite company in Wagga Wagga required a smoke leakage testing to identify the leaks inside the ductwork.
ACS Conference – Barangaroo
When their aircon system switches off after hours and is not enough for 200 people.
Channel 7 Computer Room – Portable Aircon
The Channel 7 Computer Room needed a backup air conditioning system during the annual HVAC system maintenance.
Limes Hotel – Brisbane
Limes Hotel needed outdoor heaters to warm up the atmosphere of the Rooftop Bar during the winter season.
Quay West Motor Room
The motors to a lift at Quay West Hotel malfunctioned due to overheating as the air conditioning unit had broken down.