Industries Restaurants
Restaurants
Food and beverage processing operations are particularly vulnerable to power and cooling disruptions, when even a short outage can put your product at risk.
With AirXpress Hire rental cooling and refrigeration equipment solutions available from 24-hour local service centres across Australia, you can protect your business from both planned and unplanned disruption – ensuring your processes stay on track, even when your systems don’t.
Filter search
Clear search
Categories
- Cooling
- Portable Air Conditioners
- 416 L/s
- 450 mm
- 5 kW
- 50 L
- 5000 L/s
- 6 kW
- 600 mm
- 850 W
- Cooling Fans
- 400 mm
- 450 mm
- 5 kW
- 50 L
- 5000 L/s
- 6 kW
- 600 mm
- 750 mm
- 850 W
- Evaporative Coolers
- 5 kW
- 500 L/s
- 5000 L/s
- Misting Fans
- 5000 L/s
- Ventilation
- Extraction Fans
- 416 L/s
- 6 kW
- Carpet Blowers
- 5 kW
- 50 L
- 600 mm
- 850 W
- Humidity Control
- Portable Dehumidifiers
- 5 kW
- 50 L
- 600 mm
- 850 W
- Air Cleaner Filtration Purifiers
- Air Steriliser Purifiers – Commercial
- 100 sqm
- 175 sqm
- Air Steriliser Purifiers – Medical
- 1000 mg/hr
- 175 sqm
- Odour Mould Control Removal
- 1000 mg/hr
- 175 sqm
- Heating
- Indoor Heaters
- 2000 W
- 2400 W
- Electric
- Outdoor/Patio Heaters
- 2000 W
- 25 sqm
- Electric
- Gas
- Refrigeration
- 6 kW
- Testing Equipment
- Fire Testing Equipment
- 1500 W
- Electric
- Air Leakage Testing Equipment
- 1 KW
- 1 m
- 10 kW
- 10 L
- 10 m
- 100 L
- 100 sqm
- 1000 L/s
- 1000 mg/hr
- 1000 mm
- 10000 mg/hr
- 10amp
- 10m³
- 118 to 236 L/s
- 1250 L/s
- 140 kW
- 1450 W
- 14m³
- 15 kW
- 15 m
- 15 W
- 150 L
- 1500 W
- 15amp
- 16 ft
- 1600 W
- 17000 L/s
- 175 sqm
- 18 ft
- 1800 W
- 180cm x 130cm
- 193 kW
- 1m3/h
- 2 m
- 2.5 m
- 20 ft
- 20 L
- 20 m
- 20 sqm
- 200 mm
- 2000 mg/hr
- 2000 W
- 200cm x 108cm
- 20amp
- 2100 L/s
- 2200 L/s
- 2200 W
- 2250 L/s
- 236 L/s
- 2400 W
- 240cm x 210cm
- 25 sqm
- 250cm x 110cm
- 250cm x 80cm
- 2600 L/s
- 27 sqm
- 278 L/s
- 280 W
- 3 m
- 3.5 KW
- 30 kW
- 30 L
- 30 m
- 30 W
- 300 mm
- 3000 W
- 300cm x 108cm
- 320 W
- 32amp
- 35 L
- 35 sqm
- 350 W
- 360 W
- 3900 L/s
- 3m³
- 4 m
- 4.4 kW
- 4.5 kW
- 4.7 kW
- 40 ft
- 40 L
- 400 mm
- 416 L/s
- 450 mm
- 450 sqm
- 450m3/h
- 470 L/s
- 4m³
- 5
- 5 kW
- 5 m
- 50 L
- 50 W
- 500 L/s
- 500 mm
- 5000 L/s
- 5000 mg/hr
- 50amp
- 5250 L/s
- 55 sqm
- 556 L/s
- 56 kW
- 6
- 6 kW
- 6 m
- 6 X 15 Amp
- 6.5 kW
- 60 L
- 60 sqm
- 600 mm
- 600 sqm
- 600 W
- 6500 L/s
- 6m³
- 7 kVa
- 7 kW
- 7.5 kW
- 70 sqm
- 71 kW
- 75 L
- 75 sqm
- 750 L/s
- 750 mm
- 8 L
- 8 m
- 800 mm
- 85 L
- 850 W
- 8820 L/s
- 8m³
- 9 kW
- 9.5 kW
- 900 mm
- 95 W
- 96 kW
- 99 sqm
- 9m
- air pollutants
- Air Pollution
- air purifier
- Battery Operated
- Daisy chain
- Dry Floor
- Dry Ice
- Electric
- Gas
- Humidifier
- marquee
- Mould
- oxygen booster
- Pollution
- Positive & Negative Pressure
- Using Area
- Virus
- VOC's
- Wet Floor
- Floor Slip Testing Equipment
- Dry Floor
- Wet Floor
Related projects
Hello Gorgeous Bar – Brisbane
Hello Gorgeous Bar wanted outdoor heaters with aesthetically pleasing flame effects. They wanted to attract potential customers for the outdoor area.
Jewel on the Way Restaurant- Rose Bay
Jewel on the Way Restaurant wanted outdoor heaters with aesthetically pleasing flame effects. They wanted to attract potential customers for the outdoor dining area.
The Doss House – The Rocks
The Doss House was too hot during a weekend and the air was not fresh enough to enjoy the intimate and heritage underground bar with a stylish vintage interior.
Fitness First – Darlinghurst
The temperature to workout has risen at the Fitness First Darlinghurst in peak hours since the air conditioning system was not working properly.
Bare Witness – Cafe & Restaurant
It was too hot and the air was not fresh enough to enjoy the delicious food at Bare Witness - Cafe & Restaurant.
Limes Hotel – Brisbane
Limes Hotel needed outdoor heaters to warm up the atmosphere of the Rooftop Bar during the winter season.
Halcyon House – Bucks Party
Halcyon House wanted an amazing sunset view with aesthetic pleasing heaters to add to the mood of a Bucks Party.
Harajuku Gyoza – Darling Harbour
Harajuku Gyoza restaurant wanted outdoor heaters with aesthetically pleasing flame effects to attract potential customers for the outdoor dining area.
Carriageworks Dome Cinema
One of the projection events of the Sydney Arts Festival at Carriageworks needed cooling
Brazilian Churrasco Grill Restaurant
When the heat of summer comes and the BBQ is alight it can get hot in the restaurant.
The Entourage Glebe
The current air conditioning is inadequate and faulty, often breaking down during peak heatwaves and not supplying enough cool air.
Cargo Bar Darling Harbour
The air conditioning system failed and they ordered an emergency backup system