Projects

AirXpress Hire has completed many projects in Australia. Browse through our chosen projects concerning portable air condition, temporary heating, air dehumidification, power generators, pumps rental, fans hiring, air balancing, and much more!

Filter search

Clear search
Categories
  • Cooling
    • Portable Air Conditioners
      • 416 L/s
      • 450 mm
      • 5 kW
      • 50 L
      • 5000 L/s
      • 6 kW
      • 600 mm
      • 850 W
    • Cooling Fans
      • 400 mm
      • 450 mm
      • 5 kW
      • 50 L
      • 5000 L/s
      • 6 kW
      • 600 mm
      • 750 mm
      • 850 W
    • Evaporative Coolers
      • 5 kW
      • 500 L/s
      • 5000 L/s
    • Misting Fans
      • 5000 L/s
  • Ventilation
    • Extraction Fans
      • 416 L/s
      • 6 kW
    • Carpet Blowers
      • 5 kW
      • 50 L
      • 600 mm
      • 850 W
  • Humidity Control
    • Portable Dehumidifiers
      • 5 kW
      • 50 L
      • 600 mm
      • 850 W
  • Air Cleaner Filtration Purifiers
    • Air Steriliser Purifiers – Commercial
      • 100 sqm
      • 175 sqm
    • Air Steriliser Purifiers – Medical
      • 1000 mg/hr
      • 175 sqm
    • Odour Mould Control Removal
      • 1000 mg/hr
      • 175 sqm
  • Heating
    • Indoor Heaters
      • 2000 W
      • 2400 W
      • Electric
    • Outdoor/Patio Heaters
      • 2000 W
      • 25 sqm
      • Electric
      • Gas
  • Refrigeration
    • 6 kW
  • Testing Equipment
    • Fire Testing Equipment
      • 1500 W
      • Electric
    • Air Leakage Testing Equipment
      • 1 KW
      • 1 m
      • 10 kW
      • 10 L
      • 10 m
      • 100 L
      • 100 sqm
      • 1000 L/s
      • 1000 mg/hr
      • 1000 mm
      • 10000 mg/hr
      • 10amp
      • 10m³
      • 118 to 236 L/s
      • 1250 L/s
      • 140 kW
      • 1450 W
      • 14m³
      • 15 kW
      • 15 m
      • 15 W
      • 150 L
      • 1500 W
      • 15amp
      • 16 ft
      • 1600 W
      • 17000 L/s
      • 175 sqm
      • 18 ft
      • 1800 W
      • 180cm x 130cm
      • 193 kW
      • 1m3/h
      • 2 m
      • 2.5 m
      • 20 ft
      • 20 L
      • 20 m
      • 20 sqm
      • 200 mm
      • 2000 mg/hr
      • 2000 W
      • 200cm x 108cm
      • 20amp
      • 2100 L/s
      • 2200 L/s
      • 2200 W
      • 2250 L/s
      • 236 L/s
      • 2400 W
      • 240cm x 210cm
      • 25 sqm
      • 250cm x 110cm
      • 250cm x 80cm
      • 2600 L/s
      • 27 sqm
      • 278 L/s
      • 280 W
      • 3 m
      • 3.5 KW
      • 30 kW
      • 30 L
      • 30 m
      • 30 W
      • 300 mm
      • 3000 W
      • 300cm x 108cm
      • 320 W
      • 32amp
      • 35 L
      • 35 sqm
      • 350 W
      • 360 W
      • 3900 L/s
      • 3m³
      • 4 m
      • 4.4 kW
      • 4.5 kW
      • 4.7 kW
      • 40 ft
      • 40 L
      • 400 mm
      • 416 L/s
      • 450 mm
      • 450 sqm
      • 450m3/h
      • 470 L/s
      • 4m³
      • 5
      • 5 kW
      • 5 m
      • 50 L
      • 50 W
      • 500 L/s
      • 500 mm
      • 5000 L/s
      • 5000 mg/hr
      • 50amp
      • 5250 L/s
      • 55 sqm
      • 556 L/s
      • 56 kW
      • 6
      • 6 kW
      • 6 m
      • 6 X 15 Amp
      • 6.5 kW
      • 60 L
      • 60 sqm
      • 600 mm
      • 600 sqm
      • 600 W
      • 6500 L/s
      • 6m³
      • 7 kVa
      • 7 kW
      • 7.5 kW
      • 70 sqm
      • 71 kW
      • 75 L
      • 75 sqm
      • 750 L/s
      • 750 mm
      • 8 L
      • 8 m
      • 800 mm
      • 85 L
      • 850 W
      • 8820 L/s
      • 8m³
      • 9 kW
      • 9.5 kW
      • 900 mm
      • 95 W
      • 96 kW
      • 99 sqm
      • 9m
      • air pollutants
      • Air Pollution
      • air purifier
      • Battery Operated
      • Daisy chain
      • Dry Floor
      • Dry Ice
      • Electric
      • Gas
      • Humidifier
      • marquee
      • Mould
      • oxygen booster
      • Pollution
      • Positive & Negative Pressure
      • Using Area
      • Virus
      • VOC's
      • Wet Floor
    • Floor Slip Testing Equipment
      • Dry Floor
      • Wet Floor
Industries
  • Construction
  • Facility Management
  • Events
  • Domestic
  • Commercial
  • Restaurants
  • Data Centres
  • Schools
  • Natural Disasters
  • Industrial
  • Manufacturing

Testing How Quickly Smoke Is Removed – IPC NSW

IPC NSW is a government company which required to test how quickly smoke is removed from their tenancy during a fire test using a smoke machine.

Testing Fire Stair Pressurisation System – 201 Elizabeth St

Our client required to test the Fire Stair Pressurisation System at 201 Elizabeth street using a smoke machine.

Department of Infrastructure – Brisbane Airport

The staff of the Department of Infrastructure needed emergency portable air conditioners in their Brisbane Airport Office as the temperature is increasing due to the peak heatwave in the city.

Birthday Boy Surprise Party During Covid19

Our client in Strathfield required temporal outdoor gas heaters for a birthday boy surprise party during Covid19. Moreover, he wanted that friends and family would be warmed while they are

Apartment Party – Milton Brisbane

Our client in Milton Brisbane required an outdoor heating system to maintain a warm atmosphere at the balcony area to enjoy the amazing view during the apartment party.

Wedding Party During Covid19 – Chelmer Brisbane

Our client in Chelmer Brisbane required an outdoor gas heating system to warm up the atmosphere of his backyard for the wedding party during Covid19.

Hello Gorgeous Bar – Brisbane

Hello Gorgeous Bar wanted outdoor heaters with aesthetically pleasing flame effects. They wanted to attract potential customers for the outdoor area. 

Bondi Beach – Home Heater

Our client in Bondi Beach required an outdoor heating system to maintain a warm atmosphere to enjoy the amazing view of the ocean.

Australian Chamber Orchestra – Barangaroo

Our client in Putney required an outdoor heating system to keep his family and guests warm while they are enjoying the house party.

Brisbane – Home Heater

Our client in Brisbane required an outdoor gas heating system that matches perfectly with the decoration of his backyard. Therefore, his family would be warmed while they are enjoying the

Floor Slip Testing Equipment – Canberra

The shopping centre owners in Canberra are getting sued for someone who slipped and injured themselves. We provide the service to test and verify the slip resistance in dry and

Riverside Dental Spa – Air Purifier

Riverside Dental Spa was preparing its installation to assist in an emergency or urgent dental care. Therefore, they required an air purifier that removes the virus but also kills them to

Telstra Exchange North Sydney

Telstra Exchange North Sydney needed to be cooled during an air conditioning shut down to avoid malfunctions from exposure to high temperatures.

Jewel on the Way Restaurant- Rose Bay

Jewel on the Way Restaurant wanted outdoor heaters with aesthetically pleasing flame effects. They wanted to attract potential customers for the outdoor dining area. 

Artarmon Library

Artarmon Library which is located on the lower North Shore of Sydney was getting too hot in the summer season.

House Party – Heater – Putney

Our client in Putney required an outdoor heating system to keep his family and guests warm while they are enjoying the house party.

The Royal Botanical Garden – Wedding

Our client needed to keep a cool temperature of the bridal dress and the flowers before the ceremony. As well as maintaining a comfortable temperature of the outdoor area during

Home Heater – Marrickville

Our client required an outdoor heating system that matches perfectly with the decoration of his backyard. Therefore, his family and guests would be warmed while they are enjoying the house

St Andrew’s Catholic School – Cooling Emergency

St Andrew's Catholic Primary School had a cooling emergency in Marayong campus due to the air conditioning systems was not sufficient for hot days.

Symbion Healthcare – Greystanes

The air conditioning of the Symbion Healthcare Server room shutdown over the weekend.

Suncorp & GIO Insurance – Newcastle

The Suncorp Insurance & GIO Call Centre in Newcastle was hot and humid due to an aircon malfunction caused by the heavy rain.

The Doss House – The Rocks

The Doss House was too hot during a weekend and the air was not fresh enough to enjoy the intimate and heritage underground bar with a stylish vintage interior.

Supreme Court – Cooling

Some of the installations of the heritage building where the Supreme Courts in Sydney are located was getting too hot.

Childcare – Baulkham Hills – NorthWest

A Childcare located in Baulkham Hills was getting too hot due to the extreme heatwave hitting the NorthWest of Sydney.

Central Court House – Sydney

The police who transport prisoners needed emergency portable air conditioners in their holding house and offices as the temperature is increasing due to the peak heatwave in Sydney.

Cisco – Canberra – Air Purifiers

Cisco Office in Canberra needed emergency air purification due to the poor air quality as a result of the bushfires that encircled the city.

ECCO Shoes – Warringah Mall

When the extreme heat waves of summer come and the air conditioning is not enough to cool down the ECCO Shoes at Warringah Mall.

Supporting Firefighters – Picton

By working with the RRT and the RFS, we support the volunteer firefighters and local volunteers. As we helped them to cool off and provide clean air to their temporary

Kari – Childcare – Liverpool

KARI childcare located in Liverpool was getting too hot due to the extreme heatwave hitting the West of Sydney.

Wagga Wagga – Aircon Duct Leakage Test

A duct leakage testing of air handling heat exchange units was required for an American Satellite company in Wagga Wagga.

Wagga Wagga – Smoke Leakage Testing

An American Satellite company in Wagga Wagga required a smoke leakage testing to identify the leaks inside the ductwork.

Jump! Swim Schools – Humidity Emergency

A branch of Jump! Swim schools suffered an accidental overflow of its pool overnight.

Goldman Sachs – Air Purifiers

Goldman Sachs needed emergency air purification due to the worst smog levels in Sydney history as a result of the bushfires that encircled the city. 

Latin Dance Australia – Glebe

Due to the extreme heatwave hitting Sydney, the air conditioning system at Latin Dance Australia needed and an extra portable aircon to cool down the temperature of one of the classrooms.

Harvey Norman – Cark Park Sale

Harvey Norman Car Park Sale at Wollongong needed to assure a comfortable temperature for their customers. The cooling system must have set up in the different marquees before the event

BUPA Optical – Warringah Mall

The aircon system broke down during summer season at Bupa Optical in Warringah Mall

LaserClinics – East Gardens

The aircon system is not supplying enough cool air to prevent overheating of the skincare & laser machine.  Also, it is often breaking down during peak heatwaves.  

Wotso – Zetland

When the cooling tower was not finished and clients were moving in the workspaces at Zetland.

ACS Conference – Barangaroo

When their aircon system switches off after hours and is not enough for 200 people. 

Loreto Normanhurst Girls College

Some of the classrooms at Loreto Normanhurst Girls College needed to be cooled down due to the extreme heatwave hitting Normanhurst.

HCF – Bondi Junction

The HCB Bondi Junction office gets exceptionally hot with the late morning sun during summertime.

Channel 7 Computer Room – Portable Aircon

The Channel 7 Computer Room needed a backup air conditioning system during the annual HVAC system maintenance. 

Fitness First – Darlinghurst

The temperature to workout has risen at the Fitness First Darlinghurst in peak hours since the air conditioning system was not working properly.

Caltex Server Room – Aircon

The Caltex Server Room needed to be cooled during an air conditioning shut down. to avoid malfunctions from exposure to high temperatures. 

Anytime Fitness – Ryde

Extreme heatwave hits Sydney and the air conditioning system was not enough to maintain a comfortable temperature to work out at Ryde Anytime Fitness  

Officeworks Warehouse – Evaporative Cooler

The Officeworks Warehouse was too hot and the air was not fresh enough to work comfortably.

Apple – Domayne Warrawong – Cooling

The Domayne at Warrawong ordered an emergency backup air conditioning system for the apple stand as their system was not enough for the peak heatwaves period of the day.

Howard Smith Wharves – Green House

Howard Smith Wharves was organising an event at Green House and wanted an outdoor heating system that fits perfectly with the nested house in the heart of their gardens.

Bare Witness – Cafe & Restaurant

It was too hot and the air was not fresh enough to enjoy the delicious food at Bare Witness - Cafe & Restaurant.

Splendour In The Grass – Strongbow Rose Cider

Strongbow Rose Cider required an outdoor heating system that matches perfectly with the decoration of their tent. Therefore, people attracted to the tent would be warmed while they are enjoying

Splendour In The Grass – Smirnoff Vodka

Smirnoff - Vodka wanted outdoor heaters with aesthetically pleasing flame effects to attract people and keep them warm at the Splendour in the Grass - Smirnoff Tent.

Howard Smith Wharves – MinterEllison

Howard Smith Wharves was organising the MinterElisson Gala at Howard's Hall East and they wanted to provide an outstanding outdoor heating.

Howard Smith Wharves – Wedding

Howard Smith Wharves wanted aesthetic pleasing heaters that provide excellent heating and also fit perfectly with the rustic charm of Bougainvillea House’s environment for a Wedding

Limes Hotel – Brisbane

Limes Hotel needed outdoor heaters to warm up the atmosphere of the Rooftop Bar during the winter season.

Howard Smith Wharves – Money Market

Howard Smith Wharves wanted heaters that provide excellent heating and fit perfectly with the Bougainvillea House’s environment for the Money Market. 

Halcyon House – Bucks Party

Halcyon House wanted an amazing sunset view with aesthetic pleasing heaters to add to the mood of a Bucks Party. 

Harajuku Gyoza – Darling Harbour

Harajuku Gyoza restaurant wanted outdoor heaters with aesthetically pleasing flame effects to attract potential customers for the outdoor dining area.

GrundFos Pumps – Newington

GrundFos Pumps at Newington needed to adequate a warehouse as a temporary office for their staff. However, it was too hot and the air was not fresh enough to work

Coca Cola Coopers – Fox Studios

A public social basketball event to promote coca cola’s cooper drinks in Fox Studios Sydney Australia were required a portable heating system to keep players and spectators warm.

Carriageworks Dome Cinema

One of the projection events of the Sydney Arts Festival at Carriageworks needed cooling

Hope Island QLD Boat Show – Whitehaven Yachts

Haven Yachts wanted outdoor heaters with aesthetically pleasing flame effects to attract potential buyers to their stand and boat arena at the Hope Island Boat Show. 

Bupa World Square – Heating

Airconditioning broke down in World Square Commercial Offices so they ordered an emergency backup heating system.

American Express Server Rooms

The computer server rooms needed to be cooled during an air conditioning shut down in this high rise office block in the city to avoid malfunctions from exposure to high

Brazilian Churrasco Grill Restaurant

When the heat of summer comes and the BBQ is alight it can get hot in the restaurant.

Selective High School Caringbah

Extreme heat wave hits Sydney and coincides with the graduation day for students from Caringbah Selective High School.

The Entourage Glebe

The current air conditioning is inadequate and faulty, often breaking down during peak heatwaves and not supplying enough cool air.

Cargo Bar Darling Harbour

The air conditioning system failed and they ordered an emergency backup system

Whitten & McKeough Lawyers Sydney

The Whitten & McKeough Lawyers office get very hot with the midday sun during Sydney summer.

Alien Covenant Movie Fox Studios Downunder

When a Hollywood blockbuster movie comes to Sydney to film the next Alien series, sequel to the series then we were contacted by costume and special effects department. To help

Air Liquide Botany

CO2 dry ice block making machine was breaking down as a result of humidity in the air condensing within the machine. This water then dramatically effected both the electronics and

Quay West Motor Room

The motors to a lift at Quay West Hotel malfunctioned due to overheating as the air conditioning unit had broken down.